Phase 1
Structures, roofs, and building systems of the villas are under construction. Preparations are underway to install the clubhouse’s roof structure and building systems. Construction of roads and utilities is starting.
Overall construction 66.59%
Piling 100%
Architecture 57.13%
MEP 70.94%
Exterior decoration 52.31%