Phase 1
Architectural and building work for the villas, including interior decoration, is underway. The installation of the clubhouse roof has started. Landscape architecture work and central cold water system connection are underway.
Overall construction 74.61%
Piling 100%
Architecture 62.45%
MEP 75.01%
Exterior work 77.38%