The central utility plant (CUP) provides new “smart city” infrastructure to help achieve environmental sustainability.

The Forestias has installed systems in tunnels under its roads including for drinking water. The project will have clean, high-quality drinking water to international standards.

Pipes are all of food-grade stainless steel with high resistance to corrosion. They therefore won’t rust or absorb substances and odors, combining long service life with safety and hygiene to ensure clean and healthy drinking water.

  • Installation of drinking water production systems and equipment in the CUP is 100% complete.
  • Installation of drinking water equipment and pipes in the utility tunnels within the project is 100% complete.
  • Testing and commissioning of the system is 100% complete.
  • Testing of drinking water quality, with excellent quality results, is 100% complete.