CONSTRUCTION UPDATE FOR March-2023

50%

The excavation and soil protection systems are complete. This month, we continued the structural and architectural work.

Structural Work

99%

System Installation

26%

Architectural Work

60%

PROJECT DEVELOPMENT TEAM

Developer:

Royal Aspen MQDC Town Limited

Architect of record:

The Beaumont Partnership

Design Consultant:

Perkins Eastmans (USA)

Senior Living Consultant and Community Operator:

Baycrest Global Solutions (Canada)

Interior Designer:

Studio 54

Landscape Designer:

PLandscape

Health and Brain Center Interior Designer:

DWP

Structure Engineer:

Infra

MEP Engineer:

EEC

Traffic Engineer:

Meinhardt (Thailand)

Lighting Designer:

Be-Lit

Sustainable Design Consultant:

Atelier Ten

Construction Management Consultant:

Stonehenge Inter

Main Contractor:

Ritta

MQDC
Confirmation